Denizli ESS 1 & 2
Two grid-connected storage systems delivered for ADM Elektrik Dağıtım within Türkiye’s first storage R&D project
Read case studyAnkara · Düsseldorf
PowerKonnekt EMS and PPC for Entek Elektrik's 105 MW / 121 MWh storage-integrated solar power plant, with the first partial provisional acceptance completed in just 3 days.


Project Overview
At Entek Elektrik's 105 MW / 121 MWh Büyükkışla Storage-Integrated Solar Power Plant, PowerKonnekt provides the EMS and PPC. It controls the solar plant, the CATL battery containers and the Power Electronics PCS units as one system. The first partial provisional ministry acceptance was completed in 3 days.
Capabilities Delivered
Grid Code Compliance
Grid connection requirements are built into PowerKonnekt's control software. This allowed the plant to pass acceptance testing quickly and without issues.
Power Plant Control (PPC)
Active and reactive power are controlled at the grid connection point. The plant follows the grid operator's setpoints accurately and in real time.
Hybrid Energy Management (EMS)
Solar generation and storage are coordinated under one control strategy. This manages the battery's charging and discharging together with the solar output.
Brand-Independent Integration
CATL battery containers, Power Electronics PCS and the solar plant run on a single control platform, with no dependency on any one manufacturer.
Remote Monitoring and Control
Plant operation can be monitored and controlled remotely. Alarm management supports fast response in the field.
Fast Commissioning
An experienced engineering team and technology proven across 2+ GWh of installed capacity brought the plant to acceptance in 3 days.
Büyükkışla shows what PowerKonnekt is built to do: turn equipment from different manufacturers into one plant the grid can rely on from day one.



Two grid-connected storage systems delivered for ADM Elektrik Dağıtım within Türkiye’s first storage R&D project
Read case study
Delivering Türkiye’s first grid-scale wind power plant integrated with battery storage above 10 MWh
Read case study
As part of KEDEP, Türkiye’s first energy storage R&D project, iNOVAT delivered a turnkey energy storage system for Boğaziçi Elektrik Dağıtım in 2021. The system integrates LGES batteries and Sungrow PCS, bringing grid-connected storage to the distribution network of Türkiye’s largest city.
Read case study